Installation requirements for scraper conveyor

2024.07.11
Visit volume:142次
The installation of the scraper conveyor requires the following work:
1. Positioning:
First, determine the position of the head and tail of the machine, and then determine the centerline of the scraper conveyor.
2. Laying intermediate grooves:
Lay the middle groove according to the determined conveyor centerline. If non-metallic trough boxes are used, the middle trough shall be paved with bricks and cement prefabricated panels, and then bonded with cast stone lining panels. When laying the cast stone lining board, attention should be paid to straightness, with as few joints as possible, and longitudinal gaps should be staggered to prevent the joints from being ground into grooves during work. The surface of the conveyor needs to be laid flat. If there is too much bending in the conveyor plane, it will inevitably lead to uneven force on the two chains, accelerate the wear between the chains and the cast stones on the groove wall, and even cause chain jamming. The overlap of each section of the groove should be flat without steps. Due to the structural limitations of the groove itself, adjacent intermediate grooves should not deviate too much in the vertical direction. If the conveyor is laid unevenly, the transportation power consumption will increase. The accumulated coal or debris on the machine track should be cleaned up.
3. Install the front and rear of the machine:
There should be some space left at the front and rear of the machine for easy maintenance and repair. The centerline of the sprocket should be perpendicular to the centerline of the conveyor and kept horizontal.
4-pack scraper chain:
The scraper chain should be pre connected before installation, and the scraper should be evenly distributed in the chain. If there are two chains, they should be of equal length or assembled according to the paired chains from the factory. The chain must not have any twisting phenomenon. The welding edge of the circular chain is facing upwards to prevent the chain and sprocket from getting stuck.
5 Inspection and Airfreight:
After the installation of the scraper conveyor, a comprehensive inspection should be conducted and the conveyor should be started. Idle for 2 hours, mainly check whether the driving device and scraper are operating normally. At the same time, make each adjacent middle groove close together, tighten the chain again, and adjust the chain length. During the two weeks of operation of the scraper conveyor, special attention should be paid to the tightness of the chain. The method of inspection is: if there is a driving device at the tail of the machine, jog the driving device. When there are two or more completely loose chain links on the upper chain of the tail sprocket, tighten the chain or remove the chain to reduce the length of the chain links. If there is only the head drive device, it is necessary to reverse the motor and jog it, when there are two or more completely loose chain links on the upper strand chain at the head sprocket. Similarly, it is necessary to tighten or dismantle the chain to reduce the loop.
Previous article:There is no previous record left
Copyright © 上海庞轩实业有限公司 All rights reserved Mainly engaged in waste conveyors, soundproof rooms, and laser welding machines. Welcome to inquire!
主站蜘蛛池模板: 临清市| 竹山县| 宁夏| 容城县| 赣州市| 阿拉善右旗| 三门县| 沧源| 沙湾县| 太和县| 乐平市| 布尔津县| 宜丰县| 依兰县| 柳林县| 霍城县| 萨嘎县| 会昌县| 台东县| 蒲城县| 道孚县| 辛集市| 杭州市| 衡山县| 桓仁| 泰安市| 黎川县| 鹤庆县| 新田县| 南丹县| 东台市| 巴里| 阿荣旗| 措勤县| 云浮市| 肇源县| 怀远县| 灵山县| 通江县| 永川市| 荥经县|